| Division |
Special Features |
Major Contents |
| Site oriented total methodology |
- Originality that fits to Korean characteristics
- Analysis of weaknesses using recent technologies
- Logical development throughout entire process
- Site oriented technology transfer and education
|
- Analysis of network, system, application, and client environment, and diagnosis of risk
- Diagnosis through application of recent weaknesses by CERT personnel
- Output by stage is used as data for the next stage.
- On-site education of T/F personnel during the project
|
| Establishment of PDCA life cycle |
- Reinforcement of planning
- Diversification of "-Do" area Introduction of check function
- Development through amendment
|
- Top-down method of planning by security field and factor
- Target items further segmented into 93 tasks.
- Re-checking of residual risk after completion of project
- Methodology of Planning¡æExecution ¡æChecking ¡æImprovement cycle
|
| Methodology whose validity has been proven |
- Path setting by customer requirement
- Guide & guidelines by component
- Support system for knowledge accumulation
|
- Module and consulting process re-established by requirement
- Utilization and optimization of best practice templates for policy, guideline, guide, and procedure
- Reference providing system on process, risk, and quality control
|